Joel and Erin are building a new four bedroom home on the southern edge of Slocan City. We recently spent a week with them to work with the contractors and to help look after the boys.
These four upright posts will support a south-facing roof overhang. These posts and several others they are using inside the house were cut and milled on site.
I spent most of my time framing in the main floor interior walls.
Yvonne spent her days with Erin and the boys at the beach and at the cottage we rented near the lake.
Superman fly by
Interior framing.
We'll return in a couple weeks after the roof is completed to continue with the 2nd floor framing.